Leeds Trolleybus Enquiry Day 42


Leeds Trolleybus Public Enquiry

Day 42


Wed 3 September 2014

On Day 42 of the Public Enquiry we got deep under the bonnet of the NGT scheme.  Mr Chris Cheek, a specialist consultant for First Bus was on the stand all day, first with the completion of his examination by Gregory Jones QC for First Bus and in the afternoon by Neil Cameron QC for the Applicant NGT.

Audio recordings of all the day’s sessions are linked here and commentary follows below.

In the first morning session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Gregory Jones continues to examine Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the late morning session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Gregory Jones concludes his  examination of Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the early afternoon session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Neil Cameron QC commences his examination of Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the late afternoon session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Neil Cameron QC continues to examine Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.
This was a fascinating and extremely in depth analysis which we were shown today. 

I’ve made copious notes on the cross examinations which I shall have to seriously condense if I am to prevent this from getting too long!

In short, for the first half of the day Mr Cheek continued to take the opportunity to cast serious doubts upon the NGT proposals.

He detailed a series of shortcomings demonstrated for trolleybuses in general shown in the Price Waterhouse report on the Wellington trolleybus system, which is now to be replaced.

High cost of supply of right hand drive vehicles, high maintenance costs of both vehicles and overhead cables were shown to be problematic.  Where such systems had an abundant hydro electric supply, as in Canada, or where there is an existing system, he acknowledged that there could be value in retaining them.  But with the continuous advances in hybrid and battery bus technology, it would be risky and inflexible to introduce a trolley system in Leeds.  Also because it would be the only system in the whole of the UK, there would be a strong probability of difficulties with maintenance supplies and low volume costs.  The installation of a ‘micro-fleet’ of trolleybuses was a serious weakness.

The potential for nightmare congestion in the event of breakdown or accident was identified by Mr Cheek with respect to articulated trolleybuses and said that the industry view on articulated buses had changed considerably in the last decade and that most operators would be unlikely to renew a fleet of ‘bendy buses’ since problems had been identified, chief amongst which were preference among passengers for having a seat as opposed to standing.  They might be suitable on long wide roads, but the narrow old world streets of North Leeds were not suitable.  Hence he also identified that the scheme was poor value for money due to the fact that so much needed to be spent on infrastructure to make it function.

Simply put, as a layperson it is clear to me that Metro is attempting to shoehorn NGT into a shoe which is too small.  I am reminded of the fairy tale of Cinderella when the Prince came with the glass slipper and her sisters tried to squeeze their own large feet into it, and if I recall correctly some of the more gruesome versions of the tale have the sisters cutting off their toes or their heels in order to be able to get their feet into it.  This is an apt metaphor when you think that Leeds City Council would sacrifice some of the finest and most mature heritage in order to fit in this inappropriate system.  The only difference being, that we do not want to cut off any part of our community in order to be able to shoehorn the trolleybus into our streets, but would have it imposed without consent, fitting the established community to the newcomer, not adapting that to the established conditions.

The assault on the NGT proposals continued with a lengthy analysis of the Stated Preference (SP) test which the Promoter used to justify their choice for a trolleybus.  Mr Cheek was scathing about their methodology.  Regular listeners will recall that Professor Bonsall made a very detailed and lengthy examination of Mr Chadwick over this when examining the business case.  Mr Cheek drew attention to the unrealistic, and I would say, biased, nature of the test methodology in showing a bus which went out of service in 1990 (which would have been in service 1970-1990) against a brand spanking new bus.   Apparently it had been agreed that this survey should have been redone, but it was not, because, as Mr Chadwick said, it was considered a disproportionate expenditure. 

In view of this, Mr Cheek suggested that in respect of the fact that £10million had already been spent, and that potentially £250million might be, a few thousand or even tens of thousands of pounds would have been money well spent if it clarified the likely preferences and demand from the travelling customers upon whom the success of the project relies.

This was a lengthy examination, but it was vital to clearly demonstrate the atrocious methodology in order to fully rid us of any belief in the assumptions of the SP test or the notion that they could provide a valid model, and fully hammer the nails into its coffin lid.  Mr Cheek went so far as to say that the assumption of these bus comparisons was ‘Not a credible assumption.  Not a remotely credible assumption.’  The gap shown in the survey would simply not exist.  ‘It is completely false and the idea that that gap will remain in force for 30 years…. Words fail me.’

Having listened to quite some few hours of examination on the subject of this SP test, which if I recall correctly, even by their own criteria did not prove a clear preference for trolleybuses, it seems fairly clear to me that the basis on which this test was made is a total fantasy.  I have some experience of the scientific method from my degree, and it is obvious to anyone with scientific training, and indeed any sensible layperson of average intelligence, that the kind of comparisons that were used are bordering on the scientifically fraudulent, or, to be kind, at least incompetent.

The onslaught continued with Mr Cheek stating that NGT had exaggerated their assumptions and thereby produced unreliable and speculative data which could not be supported by actual evidence, again bringing the methodology into question.

A particularly sharp accusation he made was that Metro wanted to regain control of public transport and that the TWAO was their means to gain this legal control, so that a trolleybus system had been necessary since now that the tram had been dropped, it was the only legal way to do so.  I know for a fact that Dave Haskins, Project Director of NGT said about two years ago, that Metro was ‘up for it’, when it came to regaining complete control of public transport in West Yorkshire.  So, the trolleybus has been chosen not because it is the best solution, but because it gives the political power to the local authority to get into the public transport game, at least in Mr Cheek’s view, and I am inclined to believe him.  Why else would such a problematic and expensive system be chosen?

We have seen, again and again, that the Applicant failed to make proper consultations with local residents who would be affected (eg, Thursday 17th July late afternoon session)
http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-35-july-17-2014-late-afternoon-session/ 
or that, as I believe I clearly demonstrated in my own cross examination of Mr Thomas Walker earlier that afternoon, the photomontages have been purposely doctored to suggest more positive connotations to the trolleybus.  I would myself, as a qualified Art Therapist with a training in the scientific method, would suggest that this amounts to falsifying evidence, and we are perilously close that that scientific sin with the deeply flawed SP test.

Again and again, Mr Cheek highlighted the extremely risky nature of the proposals.

When it came to cross examination by Neil Cameron QC it would seem that he worked very hard to demonstrate that the demographics not only could work, but that they supported the scheme.  There were problems with the data in that First has been reluctant to disclose its passenger data on the basis that it would be commercially sensitive, and so the results of their own forecasts could not be properly substantiated, but I have to admit, that while I am confident with the standards required for good scientific method, this advanced statistical section left me with my eyes glazing over as a fog descended on my brain.  As Disraeli so famously said ‘There are lies, damned lies and statistics’.

It may be that some of the statistics claimed by NGT on demographics are sound, but even if the available population which might use the trolleybus is correctly estimated, all the other problems remain.  And those demographics must be questioned as Mr Cheek did with the claims that users of Burley Park station would walk (mostly uphill) to NGT stops rather than use the train as they have previously done. 

Simply for Mr Cameron to rely on the fact that the scheme has reached the point that it has and argue that all the requirements set by the DfT are thus likely to have been met is not really sound in my own view, but rather a legalistic view which seeks to avoid taking account of the many practical realities (of which I have not exhausted the list, so I would urge listeners to catch his two morning sessions) and just force it through on formalities.

A brief attempt at scraping the barrel occurred when the objection to the visual pollution of the overhead wires came up.  When asked of his qualifications to make this judgement, Mr Cheek replied ‘I know what I like’.  And so do most people.  But Mr Cameron asked if he had any qualifications to make this judgement, which I found somewhere between amusing and laughable.  Simply put, most people don’t like the prospect of overhead cables.  It is an acknowledged downside of trolleybuses, and yet his judgement that they were unsightly visual pollution was called into question.  Well, I myself am qualified in the subject of visual perception and aesthetics, and I can say confidently that the intrusion of overhead cables is unaesthetic for various reasons such as impeding open views of trees, sky and local architecture.  That it creates a feeling of confinement and even probably claustrophobia in some sensitive people.  That frankly it is obvious and that anyone who calls such a view into question should have themselves questioned as to why they believe so.  I am reminded of Mr Haskins, who apparently likes standing on buses, likes maps with North pointing to five o’clock, and who apparently prefers cloudy winter skies and bare trees to blue skies and trees in full summer leaf.

The obligatory attempt to cast aspersions on the motivations behind First’s objection of course had to be endured.  The end to a long exchange was simply that in Mr Cheek’s view it is ‘Not a good scheme’.

If you can find the time to listen I can highly recommend an absorbing few hours.  The difficult bit on demographics was in the early afternoon session mostly, and if anyone wants to comment on this I should be interested.  However, in the light of all the clearly demonstrated, and frankly, obvious, downsides and risks to the trolleybus scheme, I would bear Mr Disraeli’s opinion in mind and treat that argument with a generous measure of caution.

Wednesday, 3 September 2014

Leeds Trolleybus Enquiry Day 41


Leeds Trolleybus Public Enquiry

Day 41

 Tuesday 2nd September 2014

The Enquiry resumed today after the summer break.  The greater part of the day was taken up with the completion of the examination of Mr Steve Speak on the matter of planning issues around the NGT proposals.  When that had been completed the final session was given over to the first witness for the Objectors, Mr Chris Cheek, a gentleman with a lifetime’s experience working in transport, who presented his evidence in chief.

Audio recordings  of all five of today’s sessions are linked below and I follow with this with some commentary on both the day’s proceedings and other matters around the trolleybus proposals and enquiry.


In the first morning session of the Day 41 of the Leeds Trolleybus Public Enquiry, Tuesday 2nd September 2014, the Enquiry resumes after the summer break with Gregory Jones QC, for First (Bus) West Yorkshire cross examining Mr Steve Speak who is representing Leeds City Council on Planning matters concerning the NGT trolleybus proposals.

In the late morning session of Day 41 of the Leeds Trolleybus Public Enquiry, Tuesday 2nd September 2014 Gregory Jones QC continues to cross examine Mr Steve Speak on Planning considerations regarding the NGT scheme, in this session concentrating on planning guidelines around heritage assets and damage to them.


In the early afternoon session of Day 41 of the Leeds Trolleybus Public Enquiry, Tuesday 2nd September 2014 Gregory Jones QC concludes his cross examination of Mr Steve Speak on Planning considerations regarding the NGT scheme.

In the brief mid afternoon session of Day 41 of the Leeds Trolleybus Public Enquiry Mr Steve Speak concludes his session as witness when he is re-examined by Neil Cameron QC for the Applicant NGT.


In the late afternoon session of Day 41 of the Leeds  Trolleybus Public Enquiry, Public Transport expert Mr Cheek gives his evidence in chief for First West Yorkshire and is then cross examined by Gregory Jones QC.


Today dealt with a lot of technical detail about planning policy such as Core Strategy, the Unitary Development Plan and how the Heritage policies affected the preservation of heritage along the route.

It took a little while to work into the detail and implications of these, so the reader may wish to get the detail from the recordings, but there were several points which I picked out which seemed problematic for the Applicant.

These not only clustered around conflicts with established policies and so forth, but I would suggest that the credibility of the witness was to some extent brought into question.

For instance, Mr Speak didn’t know that the ‘Stated Preference Test’ had produced a result of ‘no stated preference for tbus’.  He couldn’t recall being told this or not by his team.  One would have thought that a planner responsible for overseeing a scheme like this would at least have looked at the passenger preferences and how they might factor into the viability of the proposals, but apparently not.

A similar shortcoming was apparent with regard to the harm that Mr Philip Ward (Heritage) had admitted would be caused to listed structures, and which was against the National Planning Policy Framework (NPPF) guidelines which recognised statutory protection for listed buildings.  He was obliged to consider the conflict with Heritage policies in UDP but had to admit that he hasn’t carried out a review of that conflict.

Again and again from Mr Speak we have heard how he likes to take everything ‘in the round’ or with a ‘rounded view’.  This seems to be his stock fall back phrase, just as previous witnesses have repeatedly ‘taken a view’ (I think that was Mr Hanson) or ‘made the judgement that’ (Mr Haskins if I recall correctly).  He seems to constantly want to stand back and look at The Big Picture and not be concerned with the details, the contraventions of guidelines, agreed policies on heritage and the like.

This has consistently been a characteristic of the NGT case, in which the proponents have deviated from WebTAG guidance for instance (Mr Hanson again) but in no way will acknowledge that this is an improper way to proceed.

A little debate that blew for a while between Mr Jones and Mr Speak was about the question of whether NGT could really be considered ‘rapid transport’ as it tries to portray itself.  One admires the research team who winkle out such details as the fact that in August 2013, just a year ago (when the scheme was already in the pipeline for a TWAO application), the word ‘fast’ was removed from the ‘vision statement for NGT’ by Chairman of Metro Kieran Preston.

If the chief executive of Metro finds it necessary to remove such an important word as ‘fast’ then one might assume that the word ‘rapid’ would also be inapplicable, being synonyms.

Mr Speak tried to insist that despite not being fast it was, nonetheless ‘rapid’; however, it wouldn’t need the scalpel like precision of Mr Jones’s analytic technique to see that while the ‘Vision’ document claimed that it may be ‘key to create a Rapid Transport system’ (in their view) nonetheless even that document did not claim that it was a ‘rapid’ system itself.  In other words, the document put it forward as part of a jigsaw, rather than the whole picture when it came to a rapid transport system.

This touched on the issue of interconnectivity, which was discussed in more detail by Mr Cheek later.  However, Mr Speak was reluctant to acknowledge what seemed as plain as a pikestaff, that something which might contribute to an overall rapid transport system but which was not ‘fast’ could neither be ‘rapid’ either.

As to whether the overall system would end up being rapid ~ well you would need to have it integrated systematically into the other transport systems (buses, train stations) in Leeds for that to work, especially as the trolleybus itself would not be ‘fast’ ~ Mr Cheek in his evidence in chief pointed out that although interconnectivity has been a concept which has been floated since the late 1970s, nonetheless, NGT had given no evidence that they had actually done any work on making their system interconnective. 

In other words, if I may be so bold, it would seem to me that the ‘Vision’ that the trolleybus would be part of a ‘rapid transport system’ was a load of spin that they had no intention of making any attempt at actualising.  One is reminded also of the fact that great store has been placed on the separateness of the NGT system from others, especially buses which it would not share the same stops with, and so would be distinctly uninterconnective.

Along the way he had managed to claim that congestion on the A660 would only get worse if NGT was not implemented, while it has actually been admitted earlier that it would probably create more congestion as a result of priority lanes and ‘traffic stacking’.

One last point which came up before Mr Speak’s examination was over, was among a short series of questions put by the Inspector, Mr Whitehead.  He asked whether the witness had taken into account that Monument Moor was the start of the famous Dales Way, an ancient pathway.  Mr Speak was apparently unaware of this, and it was clear from the Inspector that he considered that he should have been.

I am sure that this will be gratifying to Mr Bill McKinnon and the Friends of Woodhouse Moor, whom he has represented at the enquiry, since he has drawn a lot of attention to Monument Moor, which has been shamefully neglected by Leeds City Council over the years, in what one might suspect is a cynical ploy to reduce the value of this historic piece of land in the eyes of local citizens order to make it easier for them to take part of it for a trolleybus lane.

Moving on to the evidence in chief of Mr Chris Cheek for First West Yorkshire, you will find the expert testimony of a gentleman who has spent his whole adult working life engaged with transport issues.  He has sat behind Mr Jones for most of the enquiry so far and has clearly had his mind well focussed on the issues.

He brought into question just about every aspect of the NGT scheme that I could think of.  Most particularly he asserted that the passenger estimates were not realistic.  I am reminded of how we were told some while back one of the witnesses had said that the passenger journey estimates for the original scheme, that included a route to St James’s and Seacroft, which had been in the region of six or seven million per annum had roughly been doubled to about twelve million or so when the eastern spurs had been dropped.  I may only be a layperson, but my maths is good enough to know that  something there doesn’t add up.  And Mr Cheek seemed to think that estimates of such matters had been exaggerated.

Moving on to the logistics of implementation, it would be ‘cumbersome’ and immensely expensive to introduce the infrastructure, and we were reminded that the introduction of further routes would each require a TWAO before they could be implemented (the spectre of further public enquiries loomed over the chamber), while a new bus route or service could be put in place at 56 days notice.  He brought attention to the fact that bus services such as the 28 and 97 might not be able to survive and so the residents of Weetwood and Adel could be without a bus, or at least suffer reduced frequency of service.

Again and again the flimsy justifications of the NGT consultants were brought down, as Mr Cheek identified that scores of trolleybus schemes around the world were being closed, and even such places as Wellington (longest running trolleybus system in the world) were abandoning them.  The ‘visual pollution’ of the overhead lines was even being reviewed by Geneva, who are about to trial more flexible quick charging buses.

If you want to know more about why the tide is turning away from trolleybuses you could do worse than listen to the final session of today’s recordings.

While on the subject of the recordings, I should say that there may be slight delays in the posting of these important documents over the next few weeks, which without disclosing the trade secrets as to how we make them, I will simply say is down to the logistics of the matter.  However, our dedicated team of Objectors are determined to take down every word that is uttered at the Public Enquiry, or at least as near as is humanly possible, and we shall get them posted on the mixcloud site as quickly as we can.

As the value of these recordings becomes ever greater, I have heard many objectors say how disgraceful it is that neither NGT nor the Council have made any effort to compile a public record, and we are astonished that the Inspector does not have a secretary or stenographer to make a written record.  Neither is there any reporter from the media routinely assigned to even make a précis for public consumption.  In the event, the Objectors' recordings, which I have the privilege to manage, are the only document of all this on the public record.  This behaviour on the part of Metro and LCC would seem to me to be an attempt to stifle awareness of these important proceedings.  However, the powers that like to think they are cannot stifle the truth in the information age.

Well there is a lot more I could add about yesterday’s proceedings and the ongoing campaign to stop the trolleybus but I have probably written enough for today so I shall leave you until the next time.

Friday, 18 July 2014

Leeds Trolleybus Enquiry Day 36


Leeds Trolleybus Enquiry Day 36

18 July 2014

Today in response to requests I have re-ordered the way the title listings are written on the Mixcloud site where the audio recordings of the Public Enquiry are hosted.

The titles will now begin with the day number and sessions are given a letter, hence the first session of day 36 reads: Day 36a  since some people were finding that the date and session listing were not fitting onto their screens and therefore weren't able to find the one they were looking for.

I have also made up an archive list of links that I will post as a blog so that they are all there in one place.  I intend in due course to also add the blurbs from this blog to each link, but that is a lot more work.

So here are the links for today's sessions given for the first time in the new format, I hope it is helpful to potential listeners.

Commentary on the day will be added shortly



In the first morning session of Day 36 of the Leeds Trolleybus Planning Enquiry 18 July 2014 the day begins with more discussion on the ongoing situation with letters being exchanged with respect to the submission of the 370 page Heritage technical document. Following this Neil Cameron QC takes Mr Speak of Planning through his evidence in Chief.



On the late morning session of Day 36 of the Leeds Trolleybus Public Enquiry 18 July 2014 Neil Cameron QC completes his examination on Mr Speak's evidence in chief for Planning and then is followed by Mr Tony Ray who cross examines Mr Speak for the North West Leeds Transport Forum.


In the afternoon session of Day 36 of the Leeds Trolleybus Enquiry, 18 July 2014, the cross examination of Mr Speak for the Planning Policy on which the Trolleybus scheme rests is cross examined by Dr John Dickinson for Weetwood Resident's Association.

Tuesday, 15 July 2014

Leeds Trolleybus Enquiry Day 33


Leeds Trolleybus Enquiry Day 33

July 15  2014


                  

The Enquiry resumed for Day 33 after a two week break with half an hour’s debate and discussion with regard to the promoter’s submission of a revised 370 page Heritage statement.






In the first morning session the matter of the Applicant's submission of a huge 370 page resubmission of their Heritage case is looked over by the Inspector and several objectors. Gregory Jones QC for First West Yorkshire raises the question of whether costs might be incurred due to the immense amount of work which would be required to review this document. Also whether private objectors would be in a position to claim costs, and not least whether the document should even be accepted by the Inspector and the implications for the entire Enquiry procedure should it be.






In the late morning session of Day 33 at the Leeds Trolleybus Public Enquiry, July 15 2014, Gregory Jones QC cross examines Mr Thomas Walker on the subject of the impact on visual amenity of the scheme should it go ahead, the photomontages which have been made to illustrate this impact in some places and the replacement of trees which NGT wishes to fell.






In the early afternoon session of day 33 of the Leeds Trolleybus Public Enquiry, July 15 2014, Gregory Jones QC cross examines Mr Thomas Walker on the landscape impacts of tree loss and the categorisation of tree quality on critical sites.






In the final session of Day 33 of the Leeds Trolleybus Public Enquiry Gregory Jones QC cross examined Mr Thomas Walker on landscape impacts of the proposed NGT trolleybus on the Leeds College of Art, for whom he was acting this afternoon.





There was rather more to Mr Jones’s speech at the beginning of the day than I could put into the summary paragraph.  It would appear that the submission of the extra Heritage document 370 pages long has been a spark to the tinder for First West Yorkshire.  They have had to put up with a lot from Metro, such as false allegations of being unco-operative when they had not even been consulted, which was exposed when Mr Henkel of Metro was cross examined in the first month of the Enquiry.



With regard to the submission of the new Heritage document, in a letter of the 4th July NGT stated that they did not admit that the original survey submission was inadequate, and so Mr Jones had to ask for justification as to why it had been submitted if this was the case, and to request that they come off the fence and admit whether it was inadequate and if that is the reason why it has been entered, or to withdraw it if it is maintained that the original was indeed adequate.



This was only part of the salvo which was fired at them in the first forty minutes or so of today’s sitting.  The main thrust which I did not fully understand immediately was that if Metro were to withdraw now, then First would not seek costs to cover their legal expenses.  My first impression was that this was in the grounds of simple rhetoric, but it was later explained to me by one of my sources that First have actually sent a letter to First informing them of this, a letter which I believe has also been sent to the Secretary of State, claiming that there is no chance of the Transport Works Order being granted due to the poor case and urging the sponsors to withdraw now, or, in effect, suffer the consequences.



This is a high risk strategy by First in that this tactic can only be used once.  If Metro ignore it, it cannot be used again.  Thus First must be motivated either by sheer bravado or a great deal of confidence in their position.  Bluffing does not seem to me to be a trick that Mr Jones would be keen on ~ he is a man who likes to pin his quarry to the wall with facts.



I wish I could say that I thought the NGT supremos had enough gumption to know when to quit, but I should be surprised if they do, and so I expect the Enquiry to continue to drag on until the end of October just as we have been expecting for the last few weeks.  For one thing, it is not they who will have to pay the costs, it is us, the mugs who pay our Council Taxes to them who will ultimately be footing the bill for this one.  



Leeds’ Labour Group are buoyed with a false sense of security engendered by the unpopularity of the Tory government (sorry, LibDems are a little lacking in credibility these days in my own world) and fail to see that the displeasure of the electorate could well be turned on them should it suddenly become widely known that they have flushed some £25 million down the tube for a folly of a project that was no more than a cheap and shoddy version of a tram project that was rejected a decade ago.  For anyone who cares to peer a little further than our Council would like us to there is always the spectre of the Edinburgh tram nightmare which is a living truth to anchor us in reality.



I should spend a little time reporting on the detail of the Enquiry which followed, but it all seemed a little flat after the importance of what went down in the first short session today.



It was instructive to hear Mr Jones taking apart the arguments of the Promoter when they suggest that ‘acceptance’ ~ basically people getting used to changes which might be imposed on them against their will, ~ is a meaningful part of the process they are proposing to inflict on the communities along the route, and hear how these changes would be whitewashed into being of no importance, when clearly they are.



I have been listening to Mr Walker and trying to characterise in my mind exactly how he comes across, and today it began to gel in my mind.  He speaks loudly and forthrightly, seemingly as a man who is confident of his position, but listen for a bit longer and he begins to sound like someone who feels that they are having to patiently explain why they are right to some child who doesn’t really understand the larger issues, and which he condescendingly has to spell out in pedantic detail.  Listen a bit more and perhaps he will begin to sound like someone who is impatient and dismissive of others who have the temerity to disagree with him.



As is frequently the case the sessions today were a lengthy trail through an immense amount of technical detail in guidelines, documents, policies and so forth.  But all the while the case is being tested and is often seen to be remarkably thin.  When Simone Wonnacott, Principal of the Leeds College of Art was informed of the NGT intention to make a compulsory purchase order on part of their land, they should not have been surprised that she might take a contrary position, and yet when they approached her with other proposals they were surprised that she did not embrace them, and again made allegations of being unco-operative.  These people like to throw accusations around, when they themselves have done nothing but try to impose their own ideas on others, and then make out everyone is at fault but themselves.  What kind of response would most people have when a situation begins with receiving a letter informing you of a compulsory purchase order on part of your property that you had had no warning about in advance?  Not the best way to start a relationship I’ll wager.

Monday, 23 June 2014

Leeds Trolleybus Enquiry Day 27

Leeds Trolleybus Enquiry Day 27

June 19  2014



The whole of day 27 was taken up with the examination by Emeritus Professor of Transport Studies Peter Bonsall of Mr Neil Chadwick who supervised the business case for the NGT scheme.

Links to audio recordings of all the sessions are given here and my commentary follows below.


In the first morning session of day 27 of the Leeds Trolleybus Public Enquiry Professor Peter Bonsall continues to cross examine Mr Neil Chadwick who is responsible for the business case which underlies the NGT proposals.

In the mid morning session of day 27 of the Leeds Trolleybus Public Enquiry Professor Peter Bonsall continues to cross examine Mr Neil Chadwick who is responsible for the business case which underlies the NGT proposals.


In the late morning session of day 27 of the Leeds Trolleybus Public Enquiry Professor Peter Bonsall continues to cross examine Mr Neil Chadwick who is responsible for the business case which underlies the NGT proposals.


In the early afternoon session of day 27 of the Leeds Trolleybus Public Enquiry Professor Peter Bonsall continues to cross examine Mr Neil Chadwick who is responsible for the business case which underlies the NGT proposals.


In the late afternoon session of day 27 of the Leeds Trolleybus Public Enquiry Professor Peter Bonsall continues to cross examine Mr Neil Chadwick who is responsible for the business case which underlies the NGT proposals.

                                                             *

I have to confess to getting a little behind with the blogging on the Public Enquiry with its somewhat gruelling schedule, so today’s commentary may be a little shorter than usual as I endeavour to catch up on it.   One of the primary purposes of this blog is to put the links for each day up online in an ordered sequence, in order that they may be more easily found and followed, so here they are for day 27, and if I get the time I will update and expand this particular entry.

There are however some subjects which have been coming up that I believe are important to mention and which readers can examine in more detail with the recordings. 

The first of these is the matter of the email correspondence which were sent from the Applicant to a Mr Charlie Sunderland at the Department for Transport.  This was raised previously and was seen both to be inaccurate, in that it suggested the Enquiry was dealing with matters that it was not, and also inappropriate in that the Applicant should not be engaging in correspondence with the DfT with regard to anything in respect of their case and the Enquiry.

This came up the other day and Mr Whitehead, the Inspector, instructed the counsel for the Applicant to construct an email to be sent to the DfT which would exit and close down the correspondence making it clear that it should not have been engaged in and that the subject matter suggested was not correctly referenced.

This was the first matter raised today when the reply email was mentioned by the Inspector who wished to ensure that the email made it clear that the procedures of the DfT were not being challenged in the Enquiry.  An ancillary point came up when Neil Cameron QC for the Applicant read out the text of the proposed reply which included the wording about the procedures used in ‘approving’ the scheme and Gregory Jones QC pointed out that he would be happier with the word ‘considering’ so that there was no assumption that approval was taken for granted.

[I am reminded that on day 25 Mr Chadwick at least twice said ‘As we move to conditional approval’, an embedded assumption of the kind I have pointed out previously as being used in Neuro Linguistic Programming.  This assumption is not correct.  There is no guarantee that conditional approval will be granted and Mr Chadwick should not suggest such a thing.  It is of some concern that this hubris seems to leak out on all sides even to the point of inappropriate correspondence to the DfT.]

I cannot speak for what impression the Inspector may have got of this, but to a layperson it rather looked as though the Applicant had got themselves into a bit of a tangle with this unwarranted correspondence to the DfT.

The Enquiry was then able to move on to the continuing cross examination of Mr Chadwick by Professor Bonsall.  One of the primary topics that he went through in great deal today was the importance of availability of seats and how many passengers would be expected to stand. 

It has been a matter of great concern to many of the objectors that the trolleybus would have such a high proportion of standing passengers.  Exact figures have not been given as the actual detailed design of the trolleybuses has not been specified yet, which is not helpful, but it is admitted that it would be in the region of about 60% during rush hour when full capacity would be expected to be reached.

A correction to wording in the documents was also accepted which would be that ‘in all time periods some passenger will [would] have to stand’.  This may be an improvement on the original wording that ‘all passengers would have to stand’ but is still not satisfactory.

Mr Chadwick was reluctant to acknowledge the significance of the fact that the importance of crowding was less in his model than that exemplified in the WebTAG guidance.

At some length he argued in principle that the ‘quality factors’ inherent in a trolleybus outweighed the disadvantage of having to stand.  As a layperson bus user this is not the way I would see it.  For me, getting a seat, especially if I am carrying the week’s groceries, is of overriding importance.

As early as twenty five minutes into the day’s proceedings it became apparent that Mr Chadwick did not know the detail of how the weighting of all these factors had been worked out, and since he is ‘the last man standing’ as Mr Jones put it, it is entirely unsatisfactory that he simply did not know how this had been worked out and he had to ask for time to get a note from his associates on this matter and answer it later.

To a layperson such as myself the Professor Bonsall’s examination may at times have seemed somewhat rarefied and abstruse, but it is at times like this that he clearly demonstrates the value of all his background preparation.  This may be the longest cross examination of the Enquiry so far, even longer than Mr Jones’s questioning of Mr Farrington in the first week, but the Inspector clearly would not have allowed him to go on at such length if he had not recognised that he was uncovering important material.  And here it is.  Mr Chadwick did not know how this had been worked out, and could not cite any documents even though he is the main proponent of the business case.

We saw this developed further in a later session when the comparison was made with other countries such as Ireland and Australia on how much people were willing to pay for a guaranteed seat.  The NGT assumption was no more than a half of the lowest value used in other countries, devaluing the importance of seating, which would thus improve their business case.  If people are not willing to pay for the 90% chance of getting a seat, then the only 40% chance of getting a seat is of less importance than it would be if they were.  A good chance of getting a seat was rated as of high importance in WebTAG, about four times more important than real time information displays, in terms of impact of ticket prices.  Of course this would be the case, the practical benefits of getting a seat being of primary importance to the elderly, shoppers, mothers with children and most other passengers.

Mr Chadwick may appear on the surface to resiliently deny all these factors which are put to him by the Professor, but as I have pointed out before, mere contradiction does not constitute a successful argument of refutation.  I am reminded of the ‘Argument’ sketch from Monty Python ~ something to the effect that an argument is a logically connected series of propositions (based on empirical or a priori data one would hope) intended to successfully refute the initial proposition, not ‘the mere gainsaying’ of it.  At which point we find we are obliged to engage in ‘the full half hour’ rather than merely a five minute taster.  And Professor Bonsall is not shy of a lot more than a half hour debate.

I shall leave today’s commentary there and hope that my readers are sufficiently interested to dip in to the recordings and consider whether I have made a fair assessment of those portions on which I have commented, or whether as my friends in the skyscraper city ghetto hold, I am merely biased.  I am certainly predisposed to argue against the trolleybus, of that I make no secret, but like Michael Palin in the Argument sketch, I would suggest that I am basing my argument on the facts elicited during examination, and not merely gainsaying the propositions I wish to disagree with, as unfortunately Mr Chadwick appears to have been doing.