Tuesday, 21 October 2014

Leeds Trolleybus Enquiry Day 65


Leeds Trolleybus Public Enquiry

Day 65


Friday 17th October 2014

Here are the links for the audio recordings of all sessions from Day 65 of the Enquiry.

Following these there is a short update on the process of making the blog, which regrettably has fallen behind a little at this late stage of the proceedings.

The first morning session of Day 65 of the Leeds Trolleybus Public Enquiry, 17th October 2014, Mr Anzir Boodoo, a former student of Transport Studies at Leeds University gives his case regarding the NGT proposals and is examined on it.

In the mid morning session of Day 64 of the Leeds Trolleybus Public Enquiry, Friday, 17th October 2014, Mr Anzir Boodoo, a former student of Transport Studies at Leeds University gives his case regarding the NGT proposals and is examined on

In the early afternoons session of Day 64 of the Leeds Trolleybus Public Enquiry, Friday, 17th October 2014, 17th October 2014, Doug Kemp gives the case against NGT for the West Park Residents and is followed by Michael Broadbent, former Traffic Police Inspector.
 

May I apologise to my readers for the absence of full commentary on my blogs of late.  The pace and load of material at the Public Enquiry has been intense as it draws towards a conclusion, which will be next week, and so I am primarily focussing on ensuring that the audio recordings of all sessions are properly made and uploaded, and listed here on my blog.

It is my intention to write commentary on those days which have been missed from blogging once the Enquiry is completed, as well as providing enhanced level normalised versions of the recordings from the early parts which did not benefit from the new software that I have been able to use since Week 9.

A major delay was unavoidable this last weekend when it became apparent that the recordings from Day 64 were problematic in that Mr Brooks spoke more quietly than any other witness or examiner at any day or sitting so far and was regrettably almost inaudible.  Clearly it was important that his evidence should be available, and to be available, it had to be audible.  This thus required an immense amount of revising of levels in an extremely selective manner.  I should emphasise that no editing has been done at any time to the recordings which would remove anything that was said, nor has the order of what was said at any time been changed.  On a small number of occasions the recordings have been initialised a few moments after the Inspector resumed the Enquiry, but nothing of any substance has been lost through this. 

On one occasion alone so far, a problem with the power supply led to about seven minutes being lost from the end of one session. This is the only loss of any substance in the recordings which has been suffered. I am somewhat relieved that it was I who was suffered this loss being the objector making the cross examination at the time, since no-one else will be put in the position of having their verbal evidence caused to be missing.  Also this is of less importance than it might have been since most of that lost section comprised of questions which the witness at the time was unable to answer and which were passed on to later witnesses, in this case Mr Ward and Mr Walker, and I was able to re-enter these questions at a later stage.

Sunday, 19 October 2014

Leeds Trolleybus Enquiry Day 64


Leeds Trolleybus Public Enquiry

Day 64


Thursday 16th October 2014


The first morning session of Day 64 of the Leeds Trolleybus Public Enquiry, Thursday 16th October 2014, Mr John Brooks gives his statement of case and is examined by Gregory Jones QC for First West Yorkshire. 
Due to the extreme quietness with which this witness spoke it has been necessary to make numerous level adjustments in order to improve audibility.


In the late morning session of Day 64 of the Leeds Trolleybus Public Enquiry, Thursday 16th October 2014, Gregory Jones QC  concludes his examination of Mr John Brooks for First West Yorkshire.
A short adjournment was taken a few minutes into this session which I have represented with a two second gap joining the two segments into one.
Due to the extreme quietness with which this witness spoke it has been necessary to make numerous level adjustments in order to improve audibility.

 

In the early afternoons session of Day 64 of the Leeds Trolleybus Public Enquiry, Thursday 16th October 2014, Neil Cameron QC commences his examination of Mr John Brooks.



Due to the extreme quietness with which this witness spoke it has been necessary to make numerous level adjustments in order to improve audibility.

In the late afternoon session of Day 64 of the Leeds Trolleybus Public Enquiry, Thursday 16th October 2014, Neil Cameron QC cross examines Mr John Brooks.
Due to the extreme quietness with which this witness spoke it has been necessary to make numerous level adjustments in order to improve audibility.


Monday, 29 September 2014

Leeds Trolleybus Enquiry Day 52


Leeds Trolleybus Public Enquiry

Day 52



Friday 26th September 2014 

Audio recordings of today's sessions are linked here, and below I am pleased to present a document I have been given permission to publish.




In the first morning session of Day 52 of the Leeds Trolleybus Public Enquiry, Friday 26th September 2014, Neil Cameron QC continues his cross examination of Mr David Alexander, Regional Managing Director for First Bus on behalf of the Applicant for the TWO, NGT.




In the late morning session of Day 52 of the Leeds Trolleybus Public Enquiry, Friday 26th September 2014, Neil Cameron QC concludes his cross examination of Mr David Alexander, Regional Managing Director for First Bus on behalf of the Applicant for the TWO, NGT.  The Inspector then has some questions of his own.




In the afternoon session of Day 52 of the Leeds Trolleybus Public Enquiry, Friday 26th September 2014, Gregory Jones QC re-examines Mr David Alexander, Regional Managing Director for First Bus.


                                                     *

The following document has come into my view and I have been given permission to quote in full here on my blog.  It is a formal reply put to Leeds City Councillors in response to the report given by Dave Haskins, Project Director of NGT, to the West Yorkshire Combined Authority (formerly Metro) a few days ago.  In that document Mr Haskins seems to suggest to the WYCA that all is going smoothly with the trolleybus at the Public Enquiry.

This is definitely not the case, as anyone who has spent any time at the enquiry or listening to the examinations on the audio recordings should know.

A group of professionals amongst the objectors and residents associations along the northern route has entered the following statement as a rebuttal of Mr Haskins attempt to soft soap Leeds CC into continuing to give it their support.  Since almost no Councillors except Barry Anderson (and hopefully John Illingworth in due course) have actually attended the enquiry one may guess that either they are listening to the recordings privately and cringeing with embarrassment, or else they remain ignorant of what they have got us into.  The likes of the Councillors Lewis, Keith Wakefield or Tom Riordan have not dared to show their faces on the fifth floor of the Regus Building off Wellington Street, and if one is up to date with the evidence, one might understand why, although such cowardice is shameful.
 So, without further ado I will quote this document in its entirety so that what has been put to the Council can be in the public domain and no-one can pretend that they are not aware of the state of the evidence as it has been presented to the Inspector.


Comments on paper by Dave Haskins on NGT

To be presented at the West Yorkshire Transport Authority meeting on 26th September 2014.


Clause 2.8 refers to "previous consultations having shown support for NGT" but this "consultation" was for a very different scheme at a very different time. The current plans have minimal support from residents and small businesses along both the northern and southern sectors of the route. In fact several surveys have revealed overwhelming opposition to the current proposals.



Clause 2.13 indicates that the Promoters’ witnesses have claimed that the scheme meets its objectives and that there is a strong Policy fit. It does not mention that these claims have been very strongly disputed by objectorswho have pointed out that the proposers’ own analysis indicates that introduction of NGT would bring increases in greenhouse gas emissions, road casualties, average waiting times, car miles driven and car journey times, together with reductions in use of active modes and of rail.



Clause 2.13 also states that the Proposers’ witnesses have claimed that the business case is strong. However, it does not alert you to the fact that the revenue forecasts have been shown to be dependent on an assumption that people will be willing to pay more to travel on a trolleybus than to travel on a conventional bus or on a train. This assumption has been made despite the fact that surveys in Leeds in 2009 showed that there was no willingness to pay more to travel on a trolleybus.



If the revenue forecasts do not materialise, there is likely to be an ongoing call on funds from Leeds and/or the Combined Authority.



Appendix 1 states that typical journey times will be faster by NGT but does not point out that this relates only to the in-vehicle part of the journey; given the expected increases in average walking and waiting times, many journeys will take longer (door-to-door) if NGT is introduced.



Appendix 1 states that improved ride comfort will result from the scheme for its users. However during the Public Inquiry it has become clear that of the 160 passenger capacity being planned only 48 passengers will be seated and 110 passengers will be standing. Lack of seating has been found to be a major concern of public transport passengers.



Appendix 1 states that up to 4000 new jobs may be created if NGT is introduced but does not point out that this forecast was based on a model which took no regard of the increased car journey times caused by NGT and treated the supposed willingness to pay to travel on trolleybus vehicles as a fact.



Appendix 1 states that property and land prices will increase in value along the corridor. However, a very recent report by a leading Estate Agent in north west Leeds , issued into public domain, states totally the opposite impact -- a reduction in property values is to be expected.



It is no secret that DfT encouraged Metro to develop a high quality state of the art bus alternative after the demise of Supertram.  The choice of a trolley bus was Metro's decision not DfT's. The Inquiry has heard very strong criticism of the decision to choose an inflexible system which, given the speed of technological innovation in the bus industry, is likely to become obsolete within a few years.



                   **********************************

These are all very serious matters of which Mr Haskins seems almost oblivious.  The enquiry has been a litany of disasterous revelations for NGT, but neither they nor the Council seem willing to admit the truth that has been elicited over the last few months, and they persist in their delusionary attempt to impose this catastrophe upon Leeds.

When this is all buried, the people of Leeds need to be able to examine in close detail who has been responsible, over the last two decades and more, for the profligate expenditure of some £40m on both the failed 'Super' tram and its sequel, the even less viable trolleybus.

I think we shall see that certain people feature prominently and we shall all want to know why they have played so loose with the financial resources of our city.  If I know one or two of them as well as I think I do, I think we can probably expect a condescending lecture on how trolleybus was the answer to all our problems and they were doing the best for us, despite ignoring our wishes, even when it has been finally seen off as a nightmare scenario and a financial disaster waiting to happen.   


Wednesday, 24 September 2014

Leeds Trolleybus Enquiry Day 49


Leeds Trolleybus Public Enquiry

Day 49




Tuesday 23 September 2014


Here are the links to the audio recordings for Day 49 of the Trolleybus Enquiry.  We are now getting into the Objectors and the pace is changing up a gear somewhat after the slow wearing away of the examination of the NGT witnesses over the last 48 days.

In the first morning session of Day 49 of the Leeds Trolleybus Public Enquiry, 23rd Sept 2014, Deborah Fahey of the Whitfields Against The Trolleybus group gives her evidence against the NGT scheme and is examined by Mr Walton for the Applicant and the Inspector, Mr Martin Whitehead.

In the late morning session of Day 49 of the Leeds Trolleybus Public Enquiry, 23rd Sept 2014, Professor Christopher Todd gives his statement of case in objection to the proposed NGT scheme and is examined by Mr Walton for the Applicant and then by the Inspector Mr Martin Whitehead.  Ms Elizabeth Reather for Leeds Cycle Action begins but is deferred to after the lunch break for circulation of documents.

In the early afternoon session of Day 49 of the Leeds Trolleybus Public Enquiry, 23rd Sept 2014, Ms Elizabeth Reather, on behalf of Leeds Cycle Action, gives their case for objection to the NGT scheme and is then examined by Neil Cameron QC and the Inspector, Mr Martin Whitehead. Following this Mrs Christine Perry gives evidence on behalf of Mrs Betty Claughton, a resident of West Park who would stand to lose part of her front garden to the road widening proposed by the scheme.  Questions follow from Mr Walton and the Inspector.


In the late afternoon session of Day 49 of the Leeds Trolleybus Public Enquiry, 23rd Sept 2014, evidence is given by Mr Doug Kemp on behalf of Mrs Bell, a resident of West Park whose property would be affected by the required works for the scheme, Ms Emma Stewart who amongst other concerns addresses disable access issues and Mr Ken Torode, a local resident who addresses discrimination against elderly passengers’ access to the scheme.  There is some cross examination by counsel for the Applicant.

Tuesday, 16 September 2014

Leeds Trolleybus Enquiry Day 47


Leeds Trolleybus Public Enquiry

Day 47


Thursday 11 September 2014


 Here are the links to the audio recordings of Day 47

In the first morning session of Day 47 of the Leeds Trolleybus Enquiry, Thursday 11 September 2014 Mr Bill McKinnon for Friends of Woodhouse Moor resumes his cross examination of Mr Kevin Leather of Mott MacDonald on the NGT Environmental Statement and is followed by Ms Dawn Carey Jones for the South Headingley Community Association.

In the late morning session of Day 47 of the Leeds Trolleybus Enquiry, Thursday 11 September 2014 Ms Dawn Carey Jones for the South Headingley Community Association concludes her cross examination  Mr Kevin Leather of Mott MacDonald on the NGT Environmental Statement and is followed by Mr Chris Foren for the A660 Joint Council and then the Inspector, Mr Martin Whitehead before the lunch break is taken.

In the early afternoon session of Day 47 of the Leeds Trolleybus Enquiry, Thursday 11 September 2014 Mr Walton for the Applicant carries out his re-examination of Mr Kevin Leather of Mott MacDonald on his Environmental Statement.

In the late afternoon session of Day 47 of the Leeds Trolleybus Enquiry, Thursday 11 September 2014 Mr Richard Caten of Ardent is examined on his evidence about Land Management by Mr Walton for the Applicant NGT, followed by Mrs Helen Pickering for the Drummonds and Churchwoods Residents’ Association and then by Mr David Graham for First West Yorkshire.  There is a short discussion about programming matters over the examination of Document B-13.

Sunday, 7 September 2014

Leeds Trolleybus Enquiry Day 42


Leeds Trolleybus Public Enquiry

Day 42


Wed 3 September 2014

On Day 42 of the Public Enquiry we got deep under the bonnet of the NGT scheme.  Mr Chris Cheek, a specialist consultant for First Bus was on the stand all day, first with the completion of his examination by Gregory Jones QC for First Bus and in the afternoon by Neil Cameron QC for the Applicant NGT.

Audio recordings of all the day’s sessions are linked here and commentary follows below.

In the first morning session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Gregory Jones continues to examine Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the late morning session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Gregory Jones concludes his  examination of Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the early afternoon session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Neil Cameron QC commences his examination of Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.

In the late afternoon session of Day 42 of the Leeds Trolleybus Public Enquiry Wednesday 3rd September 2014 Neil Cameron QC continues to examine Mr Chris Cheek, expert witness for First West Yorkshire on the viability of the NGT trolleybus proposals.
This was a fascinating and extremely in depth analysis which we were shown today. 

I’ve made copious notes on the cross examinations which I shall have to seriously condense if I am to prevent this from getting too long!

In short, for the first half of the day Mr Cheek continued to take the opportunity to cast serious doubts upon the NGT proposals.

He detailed a series of shortcomings demonstrated for trolleybuses in general shown in the Price Waterhouse report on the Wellington trolleybus system, which is now to be replaced.

High cost of supply of right hand drive vehicles, high maintenance costs of both vehicles and overhead cables were shown to be problematic.  Where such systems had an abundant hydro electric supply, as in Canada, or where there is an existing system, he acknowledged that there could be value in retaining them.  But with the continuous advances in hybrid and battery bus technology, it would be risky and inflexible to introduce a trolley system in Leeds.  Also because it would be the only system in the whole of the UK, there would be a strong probability of difficulties with maintenance supplies and low volume costs.  The installation of a ‘micro-fleet’ of trolleybuses was a serious weakness.

The potential for nightmare congestion in the event of breakdown or accident was identified by Mr Cheek with respect to articulated trolleybuses and said that the industry view on articulated buses had changed considerably in the last decade and that most operators would be unlikely to renew a fleet of ‘bendy buses’ since problems had been identified, chief amongst which were preference among passengers for having a seat as opposed to standing.  They might be suitable on long wide roads, but the narrow old world streets of North Leeds were not suitable.  Hence he also identified that the scheme was poor value for money due to the fact that so much needed to be spent on infrastructure to make it function.

Simply put, as a layperson it is clear to me that Metro is attempting to shoehorn NGT into a shoe which is too small.  I am reminded of the fairy tale of Cinderella when the Prince came with the glass slipper and her sisters tried to squeeze their own large feet into it, and if I recall correctly some of the more gruesome versions of the tale have the sisters cutting off their toes or their heels in order to be able to get their feet into it.  This is an apt metaphor when you think that Leeds City Council would sacrifice some of the finest and most mature heritage in order to fit in this inappropriate system.  The only difference being, that we do not want to cut off any part of our community in order to be able to shoehorn the trolleybus into our streets, but would have it imposed without consent, fitting the established community to the newcomer, not adapting that to the established conditions.

The assault on the NGT proposals continued with a lengthy analysis of the Stated Preference (SP) test which the Promoter used to justify their choice for a trolleybus.  Mr Cheek was scathing about their methodology.  Regular listeners will recall that Professor Bonsall made a very detailed and lengthy examination of Mr Chadwick over this when examining the business case.  Mr Cheek drew attention to the unrealistic, and I would say, biased, nature of the test methodology in showing a bus which went out of service in 1990 (which would have been in service 1970-1990) against a brand spanking new bus.   Apparently it had been agreed that this survey should have been redone, but it was not, because, as Mr Chadwick said, it was considered a disproportionate expenditure. 

In view of this, Mr Cheek suggested that in respect of the fact that £10million had already been spent, and that potentially £250million might be, a few thousand or even tens of thousands of pounds would have been money well spent if it clarified the likely preferences and demand from the travelling customers upon whom the success of the project relies.

This was a lengthy examination, but it was vital to clearly demonstrate the atrocious methodology in order to fully rid us of any belief in the assumptions of the SP test or the notion that they could provide a valid model, and fully hammer the nails into its coffin lid.  Mr Cheek went so far as to say that the assumption of these bus comparisons was ‘Not a credible assumption.  Not a remotely credible assumption.’  The gap shown in the survey would simply not exist.  ‘It is completely false and the idea that that gap will remain in force for 30 years…. Words fail me.’

Having listened to quite some few hours of examination on the subject of this SP test, which if I recall correctly, even by their own criteria did not prove a clear preference for trolleybuses, it seems fairly clear to me that the basis on which this test was made is a total fantasy.  I have some experience of the scientific method from my degree, and it is obvious to anyone with scientific training, and indeed any sensible layperson of average intelligence, that the kind of comparisons that were used are bordering on the scientifically fraudulent, or, to be kind, at least incompetent.

The onslaught continued with Mr Cheek stating that NGT had exaggerated their assumptions and thereby produced unreliable and speculative data which could not be supported by actual evidence, again bringing the methodology into question.

A particularly sharp accusation he made was that Metro wanted to regain control of public transport and that the TWAO was their means to gain this legal control, so that a trolleybus system had been necessary since now that the tram had been dropped, it was the only legal way to do so.  I know for a fact that Dave Haskins, Project Director of NGT said about two years ago, that Metro was ‘up for it’, when it came to regaining complete control of public transport in West Yorkshire.  So, the trolleybus has been chosen not because it is the best solution, but because it gives the political power to the local authority to get into the public transport game, at least in Mr Cheek’s view, and I am inclined to believe him.  Why else would such a problematic and expensive system be chosen?

We have seen, again and again, that the Applicant failed to make proper consultations with local residents who would be affected (eg, Thursday 17th July late afternoon session)
http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-35-july-17-2014-late-afternoon-session/ 
or that, as I believe I clearly demonstrated in my own cross examination of Mr Thomas Walker earlier that afternoon, the photomontages have been purposely doctored to suggest more positive connotations to the trolleybus.  I would myself, as a qualified Art Therapist with a training in the scientific method, would suggest that this amounts to falsifying evidence, and we are perilously close that that scientific sin with the deeply flawed SP test.

Again and again, Mr Cheek highlighted the extremely risky nature of the proposals.

When it came to cross examination by Neil Cameron QC it would seem that he worked very hard to demonstrate that the demographics not only could work, but that they supported the scheme.  There were problems with the data in that First has been reluctant to disclose its passenger data on the basis that it would be commercially sensitive, and so the results of their own forecasts could not be properly substantiated, but I have to admit, that while I am confident with the standards required for good scientific method, this advanced statistical section left me with my eyes glazing over as a fog descended on my brain.  As Disraeli so famously said ‘There are lies, damned lies and statistics’.

It may be that some of the statistics claimed by NGT on demographics are sound, but even if the available population which might use the trolleybus is correctly estimated, all the other problems remain.  And those demographics must be questioned as Mr Cheek did with the claims that users of Burley Park station would walk (mostly uphill) to NGT stops rather than use the train as they have previously done. 

Simply for Mr Cameron to rely on the fact that the scheme has reached the point that it has and argue that all the requirements set by the DfT are thus likely to have been met is not really sound in my own view, but rather a legalistic view which seeks to avoid taking account of the many practical realities (of which I have not exhausted the list, so I would urge listeners to catch his two morning sessions) and just force it through on formalities.

A brief attempt at scraping the barrel occurred when the objection to the visual pollution of the overhead wires came up.  When asked of his qualifications to make this judgement, Mr Cheek replied ‘I know what I like’.  And so do most people.  But Mr Cameron asked if he had any qualifications to make this judgement, which I found somewhere between amusing and laughable.  Simply put, most people don’t like the prospect of overhead cables.  It is an acknowledged downside of trolleybuses, and yet his judgement that they were unsightly visual pollution was called into question.  Well, I myself am qualified in the subject of visual perception and aesthetics, and I can say confidently that the intrusion of overhead cables is unaesthetic for various reasons such as impeding open views of trees, sky and local architecture.  That it creates a feeling of confinement and even probably claustrophobia in some sensitive people.  That frankly it is obvious and that anyone who calls such a view into question should have themselves questioned as to why they believe so.  I am reminded of Mr Haskins, who apparently likes standing on buses, likes maps with North pointing to five o’clock, and who apparently prefers cloudy winter skies and bare trees to blue skies and trees in full summer leaf.

The obligatory attempt to cast aspersions on the motivations behind First’s objection of course had to be endured.  The end to a long exchange was simply that in Mr Cheek’s view it is ‘Not a good scheme’.

If you can find the time to listen I can highly recommend an absorbing few hours.  The difficult bit on demographics was in the early afternoon session mostly, and if anyone wants to comment on this I should be interested.  However, in the light of all the clearly demonstrated, and frankly, obvious, downsides and risks to the trolleybus scheme, I would bear Mr Disraeli’s opinion in mind and treat that argument with a generous measure of caution.

Friday, 18 July 2014

Audio Archive Links Index for the Leeds Trolleybus Public Enquiry 2014


Audio Archive Links Index 
for the 
Leeds Trolleybus Public Enquiry 2014


I have recently had a request to reformat the titles of the audio uploads so as to make them more easily searchable for those who access them through devices with small screens that have not been able to see the day number in the title on the Mixcloud site.

Consequently I have from today, Day 36 :  18 July 2014 started to write the titles with the day number at the beginning and a letter to denote the session.  Hence, the title of today’s first session is Day 36a  Leeds Trolleybus Public Enquiry 18 July 2014

It would be too large a task to change all the existing titles, if I were to do that I would want to completely re-upload and match the URLs at the same time, so instead I have made up this index list of audio links with the blog posts at the head of them.  I will in time make a parallel index but with blurbs for each day, and will periodically update the list.

I hope this will make the archive more easily searchable. 

Now updated to include all sessions in the first forty days of the Enquiry before the Summer Break.  Links from the institution of the new numbering starting from Day 36a also have blurbs with them
http://www.mixcloud.com/CosmicClaire/day-36a-leeds-trolleybus-public-enquiry-18-july-2014-first-morning-session/


Day 1 :  29 April 2014

                

http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-1-april-29-2014-afternoon-session/

 


Day 2 :  30 April  2014


http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-2-april-30-2014-first-morning-session/



http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-2-april-30-2014-early-afternoon-session/


http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-2-april-30-2014-late-afternoon-session/



Day 3 :  1 May 2014



http://www.mixcloud.com/CosmicClaire/leeds-trolleybus-public-enquiry-day-2-may-1-2014-early-afternoon-session/




Day 4 :  2 May 2014

 




Day 5 :  7 May 2014






Day 6 :  8 May 2014









Day 7 :  9 May 2014





Day 8 :  13 May 2014






Day 9 :  14 May 2014  









Day 10 :  15 May 2014






Day 11 :  16 May 2014






Leeds Trolleybus Enquiry:  What We Are Fighting For



Day 12 :  19 May 2014




Day 13 :  20 May 2014







Day 14 :  21 May 2014







Day 15 :  22 May 2014






Day 16 :  23 May 2014




Edinburgh Tram on R4  31 May 2014


Day 17 :  03 June 2014






Day 18 :  04 June 2014






Day 19 :  05 June 2014






Day 20 :  06 May 2014






Day 21 :  10 June 2014






Day 22 :  11 June 2014






Day 23 :  12 June 2014






Day 24 :  13 June 2014





Day 25 :  17 June 2014 






Day 26 :  18 June 2014






Day 27 :  19 June 2014







Day 28 :  20 June 2014





Day 29 :  24 June 2014






Day 30 :  25 June 2014






Day 31 :  26 June 2014



Day 32 :  27 June 2014





Day 33 :  15 July 2014






Day 34 :  16 July 2014






Day 35 :  17 July 2014





New title listings begin Day 36

Day 36 :  18 July 2014

In the first morning session of Day 36 of the Leeds Trolleybus Planning Enquiry 18 July 2014 the day begins with more discussion on the ongoing situation with letters being exchanged with respect to the submission of the 370 page Heritage technical document. Following this Neil Cameron QC takes Mr Speak of Planning through his evidence in Chief.

On the late morning session of Day 36 of the Leeds Trolleybus Public Enquiry 18 July 2014 Neil Cameron QC completes his examination on Mr Speak's evidence in chief for Planning and then is followed by Mr Tony Ray a retired Town Planner who cross examines Mr Speak for the North West Leeds Transport Forum.

In the afternoon session of Day 36 of the Leeds Trolleybus Enquiry, 18 July 2014, the cross examination of Mr Speak for the Planning Policy on which the Trolleybus scheme rests is cross examined by Dr John Dickinson for Weetwood Resident's Association.




Day 37 :  21 July 2014: Only Session


In the only session of Day 37 of the Leeds Trolleybus Public Enquiry, 21 July 2014, Mr Bill McKinnon for Friends of Woodhouse Moor cross examines Mr Speak of Planning for Leeds City Council on planning issues around the trolleybus and green space provision which would be affected on Woodhouse Moor.


Day 38  :  22 July 2014


In the first morning session of Day 38 of the Leeds Trolleybus Public Enquiry Emeritus Professor Peter Bonsall cross examines the recalled Mr Neil Chadwick on the business case focussing on the arguments around passenger preferences.

In the late morning session of Day 38 of the Leeds Trolleybus Public Enquiry, 22 July 2014, Professor Bonsall concludes his re-examination of Mr Neil Chadwick on the business case and justification for the NGT proposals, and is then followed by Gregory Jones QC who commences his own cross examination.


In the early afternoon session of Day 38 of the Leeds Trolleybus Public Enquiry, 22 July 2014, Gregory Jones QC continues his cross examination of Mr Neil Chadwick on the business case for the NGT trolleybus focussing on the methodology and research which is claimed to support the choice of pursuing this scheme.


In the late afternoon of Day 38 of the Leeds Trolleybus Enquiry, 22 July 2014, Gregory Jones QC continues to cross examine Mr Neil Chadwick on the business case underlying the NGT trolleybus scheme proposals.

Day 39  :  23 July 2014



In the first morning session of Day 39 of the Leeds Trolleybus Public Enquiry Mr Cameron gives his verbal response to the letters that have been generated in reply to the submission of the additional 370 page Heritage document some weeks ago.  This is followed by the Inspector’s deliberations and Mr Jones for First.


In the late morning session of Day 39 of the Leeds Trolleybus Public Enquiry 23 July 2014 Mr Stuart Natkus cross examines Mr Speak on Planning issues for his clients who are statutory objectors and is followed by Mr Chris Foren for the A660 Joint Council.


In the early afternoon session of Day 39 of the Leeds Trolleybus Public Enquiry 23 July 2014 Mr Chris Foren for the A660 Joint Council completes his examination of Mr Speak on Planning issues and is followed by Ms Dawn Carey Jones for the South Headingley Community Association.


In the late afternoon session of Day 39 of the Leeds Trolleybus Public Enquiry 23 July 2014 Neil Cameron QC re-examines Mr Speak and is then followed by Gregory Jones QC who picks up his cross examination of Mr Neil Chadwick on the business case for the proposed NGT system.

Day 40  :  24 July 2014


In the first morning session of Day 40 of the Leeds Trolleybus Public Enquiry, after admin and timetable matters have been dealt with, Mr Stuart Natkus, acting for his clients, Statutory Objectors, examines Professor Jeremy Purseglove on ecological issues around Headingley Hill.


In the late morning session of Day 40 of the Leeds Trolleybus Public Enquiry Gregory Jones QC completes his cross examination of Mr Neil Chadwick on the business case for NGT and is followed by Neil Cameron QC who carries out the re-examination of the witness.
The Inspector then gives his decision on the matter of whether he will accept the Heritage technical appendix and this is followed by some brief discussion of the coming timetable.
The Enquiry is now adjourned for the summer break and will resume at 10am on Tuesday 2nd September 2014.